Attached Full Bath
Attached Full Bath
Lots of natural light shines throughout this 2-bedroom, 2-bathroom villa, just steps away from the Salty Dog.
You'll love the recently renovated kitchen, which is located just off the foyer. All overlooking the open-concept living and dining room and out to the Calibogue Sound.
The master bedroom consists of a king bed, a walk-in closet, and an attached master bathroom. The master bathroom is nicely renovated with a custom tiled walk-in shower. The guest bedroom consists of a king bed. The guest bathroom is also fully renovated and has a cute tile with a tub and shower combination. Both bedrooms have views of the water.
Please note, there is no elevator access to the villa.
Walk to the tennis, pickleball courts, and the beach. Or simply enjoy the views from the balcony, watching the wildlife and boats on the water, while listening to the music from the South Beach Marina!
Key Features:
- Proximity to the beach: 3 minute walk
- Pets are not allowed
Rent price includes: Rental Rate, Hospitality Program, Beach Gear Credit, Booking Processing Fees, and Departure Clean. Your Luxury Concierge is included with no additional cost.
South Beach Marina Village
- Walk to South Beach Marina
- Ideal location for those who desire proximity to boating, shopping, dining, and tennis.
Please be advised that from early fall 2024 with an estimated completion time of spring 2025. Phase 5 of the Sea Pines Drive Infrastructure Improvement Project. Motorists should expect traffic delays, traffic detours, and be prepared to share the road with bike riders and pedestrians. Sidewalks and leisure trails in the project area will be closed as needed.
- Bluff Villas
- View
- Water View
-
Community Playground
-
Complimentary Concierge Services Included
-
Vay K Life
-
Bath Towels
-
Hair Dryer
-
Travel sized toiletries (shower gel, shampoo, conditioner, soap)
-
Bedding & Sheets
-
Hangers
-
Pillows & Blankets
-
TV
-
Air Conditioning
-
Heating
-
Dryer
-
Iron
-
Washing Machine
-
No Pets Allowed
-
No Smoking
-
Wifi
-
Bakeware
-
Bowls, Plates, Mugs
-
Cookware
-
Dinnerware
-
Dishwasher
-
Drip Coffee Maker
-
Forks, Spoons, Knives
-
Fridge
-
Glassware
-
Microwave
-
Oven
-
Paper Towels, etc.
-
Pots, Pans, Cutting Boards, Knives
-
Stove
-
Monthly Stays
-
Winter Monthly Stay
-
Clean with disinfectant
-
Enhanced cleaning practices
-
Keyless, no contact check-in and check-out
-
Towels and bedding washed in water that’s at least 60°C/140°F between stays
Hilton Head Island's beach is crucial to both residents and the local economy. To preserve this valuable resource, the Town has planned a beach restoration project for Summer 2025, funded primarily by tourism through the local Beach Preservation Fee.
- The 2025 beach renourishment is expected to be similar to the previous projects in 1990, 1997, 2006 and 2016.
- The proposed project will include the placement of approximately 2.2 million cubic yards of beach compatible sand from up to four offshore borrow areas along about 46,500 ft of Atlantic Ocean and Port Royal Sound shoreline.
- This project is part of the Town's ongoing beach management program, with renourishment scheduled every 8 to 10 years, depending on weather and beach conditions.
- Pine Island in Hilton Head Plantation will be included in the 2025 restoration.
The proposed project will include sand placement along five areas of the island shoreline:
- South Beach / South Island - Approximately 750,000 cubic yards of sand along approximately 10,230 feet of the southern Atlantic Ocean shoreline.
- Central Island - Approximately 700,000 cubic yards along 28,860 feet of Atlantic Ocean shoreline.
- The Heel - Approximately 500,000 cubic yards of sand along 5,280 feet at the northeast point of the island at the intersection of the Atlantic Ocean and Port Royal Sound shoreline.
- Fish Haul Creek - Approximately 50,000 cubic yards of sand along about 2,130 feet of Port Royal Sound shoreline.
- Pine Island - Approximately 180,000 cubic yards of beach compatible sand and construction of six rock breakwaters on the Port Royal Sound shoreline of Hilton Head Plantation between Dolphin Head and Pine Island.
The nourishment sand will be excavated by hydraulic dredge from two offshore shoal features.
- Up to 50,000 feet of pipeline will be trucked or floated to the island by way of large rafts, then moved onto the beach.
- The pipeline will be piled in stacks along the shoreline until needed during construction.
- During construction, many miles of pipeline will be submerged on the ocean floor between the offshore borrow sites and the beach.
- The rest of the pipeline will be laid progressively along the newly constructed beach as the fill sand is pumped on shore.
The dredge will pump a mixture of sand and seawater through the pipeline, and will discharge it onto the beach.
- There, it will flow parallel to the shoreline - allowing the sand to settle out and the water to return to the sea.
- Bulldozers and other heavy construction machinery will constantly shape the sand to meet the design specifications.
Project construction is expected to last approximately six months, operating around the clock.
- On average, the process should move along the shoreline at a rate of about 200 to 300 feet per day.
- As the fill placement progresses, approximately 1,000 foot sections of the beach are closed temporarily to pedestrian access.
- Several days of work activity will occur seaward of any one piece of oceanfront property in the 1,000 foot active work area along the beach.
- Once placed and rough-graded, the new beach is immediately reopened to the public.
- Construction noise will primarily involve bulldozers shaping the sand as it is deposited.
- Disruptions at individual properties generally last about three or four days as the renourishment operation progresses.
- Adjacent property owners, or renters, may experience short-term minor inconveniences.
Preserving Hilton Head Island's beaches supports the local environment, economy, and quality of life for residents and visitors alike
The project is sponsored and funded by the Town of Hilton Head Island and engineered by is Olsen Associates, Inc.